Pages

Thursday 17 May 2012

Ready to pour

Afternoon driveby revealed the formwork completed, term guards on all pipes and electric feeds, reo and pods installed. I have a feeling the slab will be poured tomorrow. It's a 2 hour stop work meeting in the schools tomorrow morning, so I may drag Mack along to watch the slab going down ;-) 

View from the rear across the laundry to Mack's room
The slab plan calls these diagonal bars '2-N12 BARS 1500 LONG, TYPICAL, TIED TO UNDERSIDE OF FABRIC'.

Tied with garbage bag ties.
Still, I can appreciate the engineering need for them where the slab steps in or out.

No comments:

Post a Comment